Paver patio · 20x20
How Many Pavers for a 20x20 Patio?
A 20' × 20' patio is 400 sq ft. With 4" × 8" pavers that is 1,800 by area; laid in running bond it is 1,830 pieces, 60 of them cut at the edges, and with 5% for breakage you buy 1,922. With 12" × 12" patio stones you buy 420, and with 16" × 16" stones 237.
Open this 20x20 patio in the 3D calculator
Pavers for a 20x20 patio by size
| Paver | Pattern | By area | Pieces with cuts | Buy (+5%) | Cost |
|---|---|---|---|---|---|
| 4" × 8" brick paver | Running bond | 1,800 | 1,830 | 1,922 | $1,691 |
| 6" × 9" paver | Running bond | 1,067 | 1,100 | 1,155 | $1,825 |
| 12" × 12" patio slab | Stack bond (grid) | 400 | 400 | 420 | $790 |
| 16" × 16" patio slab | Stack bond (grid) | 225 | 225 | 237 | $1,299 |
| 12" × 24" plank paver | Running bond | 200 | 210 | 221 | $2,206 |
Counts by the nominal size, laid from one corner; each piece cut at an edge takes a whole paver. Sample prices from one US home center (Nov 18–22, 2026).
Base, sand and edging for a 20x20 patio
- Paver base: 9.2 tons of crushed stone, 4" compacted, reaching 6" past the edges.
- Bedding sand: 1.7 tons, 1" under the pavers.
- Joint sand: 5 bags of polymeric sand, 50 lb.
- Edge restraint: 80 ft around the patio, with 80 spikes.
Questions about a 20x20 patio
How many 12x12 pavers for a 20x20 patio?
400 stones of 12" × 12" in a straight grid, none cut. With 5% for breakage, buy 420.
How many 16x16 pavers for a 20x20 patio?
225 stones of 16" × 16" in a straight grid, none cut. With 5% for breakage, buy 237.
How much base and sand for a 20x20 paver patio?
About 9.2 tons of crushed stone for a 4" compacted base reaching 6" past the edges (20% added for compaction), 1.7 tons of bedding sand for 1" under the pavers, and 5 bags of polymeric joint sand.
Herringbone or running bond for a 20x20 patio?
With 4" × 8" pavers both take 1,830 pieces here, 60 of them cut. Herringbone locks together best; running bond is quicker to lay.