Deck footings · Live 3D

Deck Footing Calculator

See how much deck each post holds up, the footing the code asks for under it, the least depth that footing needs (your frost line may ask for more), and how many form tubes and bags of concrete to buy — hole by hole. Free, no sign-up.

3D view of the deck footings

Drag to orbit · Ctrl + scroll or pinch to zoom · buried concrete shows in the Footings and Posts stages

Footing checks pass for these inputs — confirm with your building department

Footings
3
1 × 17" × 6" pad + 12" pier · 2 × 14" × 6" pad + 12" pier
Concrete
14 bags
80 lb · 8.1 cu ft
Form tubes
3
4' long
Busiest post
45 sq ft
deck area it carries
Footing depth
36"
bottom below grade; these footings need 12"+
Estimated cost
$330
3 of 4 items priced

Your deck

Deck
ft
ft
ft
Load and soil
Footings

Your footings

Plan — the shaded area is the deck each post carries

HouseCarried by the ledger on the houseP1: 29 sq ft — 14" × 6" pad + 12" pierP2: 45 sq ft — 17" × 6" pad + 12" pierP3: 29 sq ft — 14" × 6" pad + 12" pierP129 sq ftP245 sq ftP329 sq ft16' wide · 12' deep

Footings by post

PostWhereDeck it carriesIRC minimumFootingConcrete
P1 Front beam, end29 sq ft13-13/16" round, 6" thick14" × 6" pad + 12" pier2.6 cu ft · 4.4 bags
P2 Front beam, middle45 sq ft16-13/16" round, 6" thick17" × 6" pad + 12" pier2.9 cu ft · 4.8 bags
P3 Front beam, end29 sq ft13-13/16" round, 6" thick14" × 6" pad + 12" pier2.6 cu ft · 4.4 bags

IRC minimum: Table R507.3.1 for 40 psf (ground snow 40 psf or less) on 1,500 psf soil. Bags are per hole, 80 lb; part bags carry over to the next hole.

Sections

36"deep1 × 17" × 6" pad+ 12" pierpad 17" × 6"
36"deep2 × 14" × 6" pad+ 12" pierpad 14" × 6"

Sample prices from one US home-center website (West Sacramento, CA store), Nov 18, 2026 — prices vary by region and week. Type your store’s prices; they stay in this browser and are shared with the other calculators.

3 footings · 14 bags
$3303/4 priced
List

Updated November 2026 · Sizes from IRC 2021 Table R507.3.1 · How we calculate

What this calculator gives you

  • A footing plan — the beam lines and posts from the deck calculator, with the deck area each post carries drawn and measured.
  • A footing for every post — from IRC Table R507.3.1 for your load and soil: a plain form tube when one is big enough, otherwise a round or square pad with a tube pier.
  • Concrete hole by hole — cubic feet and bags for each footing and in total, and the form tubes to buy.
  • Sections — each footing type drawn in the ground with its depth, pad and pier.
  • Checks — the table range, minimum depth and frost line, room for the pier above a pad, footings near the house, and when deck blocks are allowed.

Minimum footing size by the area a post carries

IRC 2021 Table R507.3.1, 40 psf live load (ground snow 40 psf or less). Round footing diameter × plain-concrete thickness:

Deck area per post1,500 psf soil2,000 psf soil3,000 psf soil or more
20 sq ft12" × 6"9" × 6"8" × 6"
40 sq ft16" × 6"14" × 6"12" × 6"
60 sq ft19" × 6"17" × 6"14" × 6"
80 sq ft22" × 7"19" × 6"16" × 6"
100 sq ft25" × 8"21" × 6"17" × 6"
120 sq ft27" × 9"23" × 7"19" × 6"
140 sq ft29" × 10"25" × 8"21" × 6"
160 sq ft31" × 11"27" × 9"22" × 7"

The table allows interpolation between rows but not beyond 160 sq ft; the calculator interpolates. Snow-load tables (50, 60 and 70 psf) are built in.

How the numbers are worked out

Area each post carries

Along a beam, each post carries half the way to the next post; the end posts carry out to the edge of the deck. Across, the beam carries half the joist span plus the overhang past it. The beams and posts are placed exactly as in the deck material calculator, so the two pages agree.

Footing and concrete

The table gives the minimum round diameter (or square side) and thickness for that area and your soil. If a 10" or 12" tube is at least that wide inside (counted as 9-1/2" and 11-1/2", as one home center lists them), the tube is the footing; otherwise the footing is a pad of the table size at the bottom of the hole with a tube pier up to 2" above grade: a round pad at least 14" across under a 12" pier, or a square pad at least 12" with the largest tube that leaves 1" of pad on each side. An 8" tube is not used under a 6x6 post: 7-1/2" inside is less than the post's diagonal. Concrete is the pad plus the pier, divided by your bag's yield.

This is a planning estimate. Frost depth, soil and local amendments come from your building department. Call 811 before you dig.

Frequently asked questions

How big should deck footings be?

It depends on how much deck each post holds up and on your soil. Under IRC Table R507.3.1 (40 psf live load, 1,500 psf soil), a post carrying 40 sq ft needs a 16" round footing 6" thick, and one carrying 80 sq ft needs 22" round and 7" thick. On the default 16' × 12' deck the middle post carries 45 sq ft (17" × 6" pad + 12" pier) and each end post 29 sq ft (14" × 6" pad + 12" pier).

How deep do deck footings need to be?

At least 12" below undisturbed ground (IRC R507.3.2) and below your frost line, whichever is deeper. The IRC requires the frost line (or solid rock, or another approved method) when the deck is attached to a house on frost-protected footings (R507.3.3); DCA 6 asks for it on every deck. The IRC does not clearly exempt freestanding decks, so any exemption is your building official's call. There is no national frost map: your building department sets the depth. DCA 6 also says that footings closer than 5 ft to the house foundation bear at the same elevation as the house footing. The calculator takes your depth and plans the pad and tube to it.

How many bags of concrete per deck footing?

A 12" form tube in a 36" hole, filled to 2" above grade, holds about 2.49 cu ft by its 12" size (2.28 cu ft if it measures 11-1/2" inside): 4.1 bags of 80 lb mix (0.6 cu ft each) or 5.5 bags of 60 lb (0.45 cu ft). A wide pad at the bottom adds more, and so does a hole dug wider than the form. The calculator buys for the full 12" size and lists the concrete for every hole and the total.

Do corner posts need the same footing as the others?

No. The IRC sizes a footing by the deck area its post carries, and an end post carries less than the posts between it and the next. On the default deck that drops the end footings from 17" × 6" pad + 12" pier to 14" × 6" pad + 12" pier, saving 1 bag. One caution from DCA 6: its own footing table is written for middle posts and lets a corner footing shrink only to 0.9 of that, because a corner post with a knee brace takes extra load, and DCA 6 braces corner posts taller than 2'. When the posts are that tall, the calculator holds corner footings to 0.9 of the middle ones (on a beam with only two posts, of the footing a middle post at that spacing would need), in both sizing modes, and the deck calculator does the same.

Can I use deck blocks instead of footings?

Only for a small, low, freestanding deck. The IRC allows precast pier blocks when the deck is not attached to the house, is 200 sq ft or less, its walking surface is no more than 20" above grade anywhere within 36" of its edge, and the joists rest directly on the blocks with no beams or posts. A freestanding deck whose joists rest on the ground along their full length needs no footings at all. Otherwise the IRC calls for footings sized from the table, or another approved structural system.

When do I need a pad instead of a plain tube?

The calculator plans with the 10" and 12" form tubes one home center stocks, which it lists at 9-1/2" and 11-1/2" actual, so each tube counts only as a footing of that smaller size. (Its 8" tube, 7-1/2" inside, is narrower than the 7.8" diagonal of a 6x6 post, so it is not used under one.) When the table asks for more, it plans a pad of the table size and thickness at the bottom of the hole, with a tube pier above it to 2" above grade: a 12" pier on a round pad at least 14" across, or on a square pad (at least 12") the largest tube that leaves 1" of pad on each side.

Planning the rest? Deck material calculator · Deck joist span calculator · Deck stair calculator