What this calculator gives you
- Concrete — the volume with your extra, as bags of 40, 50, 60 or 80 lb mix or as ready-mix yards ordered by the quarter yard.
- The gravel base — in tons, as a supplier sells it, with 20% added for compaction.
- Steel — #3 or #4 rebar as 20' sticks, lapped where a bar is longer than a stick, or 3-1/2' × 7' sheets of wire mesh, with the chairs to hold it.
- Forms — boards as wide as the slab is thick, cut from stock lengths, and the stakes.
- Control joints — panels close to square, drawn on the plan and the model.
Concrete for common slab sizes, 4" thick
The slab's own volume, with nothing added for spillage:
| Slab | Cubic feet | Cubic yards | 80 lb bags | 60 lb bags |
|---|---|---|---|---|
| 8' × 8' | 21.3 | 0.79 | 36 | 48 |
| 10' × 10' | 33.3 | 1.23 | 56 | 75 |
| 10' × 12' | 40.0 | 1.48 | 67 | 89 |
| 12' × 12' | 48.0 | 1.78 | 80 | 107 |
| 12' × 16' | 64.0 | 2.37 | 107 | 143 |
| 16' × 16' | 85.3 | 3.16 | 143 | 190 |
| 20' × 20' | 133.3 | 4.94 | 223 | 297 |
| 24' × 24' | 192.0 | 7.11 | 320 | 427 |
An 80 lb bag makes 0.6 cu ft and a 60 lb bag 0.45 cu ft (QUIKRETE). A cubic yard is 27 cu ft: 45 bags of 80 lb.
How the numbers are worked out
Concrete
Length × width × thickness gives the slab's volume; your extra (5% to start) covers spillage, a base that is not perfectly flat and forms that bow. Bags are that volume divided by the bag's yield, rounded up; ready-mix is the volume in cubic yards rounded up to the next quarter yard.
Base
The base covers the slab's footprint at the thickness you enter, measured compacted. Crushed stone loses about a sixth of its volume when it is compacted, so the calculator buys 20% more, and converts it to tons at about 1.4 tons per cubic yard — ask your yard for its own figure.
Steel, forms and joints
Rebar runs both ways, 3" in from the edges and no farther apart than your spacing; a bar longer than a 20' stick is made of whole sticks and a last piece, lapped 40 bar diameters (15" for #3, 20" for #4) where they meet, and the last pieces share sticks. Mesh sheets lap 6". Form boards are the narrowest lumber at least as wide as the slab is thick (2x4 boards are 3-1/2" wide, 2x6 boards 5-1/2"), with a stake at each end and every 3'. Control joints are no more than 30 times the thickness apart (10' for a 4" slab), and leave panels no more than 1.5 times as long as wide.
Frequently asked questions
How many bags of concrete do I need for a 10 x 10 slab?
A 10' × 10' slab 4" thick is 33.3 cu ft of concrete: 56 bags of 80 lb mix (0.6 cu ft each) or 75 bags of 60 lb (0.45 cu ft). With 5% extra for spillage and uneven ground, buy 59 bags of 80 lb. That is 1.23 cu yd: past about a yard, a ready-mix truck is usually cheaper and easier.
How many yards of concrete for a 12 x 12 or 20 x 20 slab?
At 4" thick, a 12' × 12' slab takes 1.78 cu yd (48 cu ft) and a 20' × 20' slab 4.94 cu yd. Ready-mix is ordered by the quarter yard, so with 5% extra order 2 and 5.25 cu yd. A yard covers 81 sq ft at 4" thick.
How thick should a concrete patio be?
Patios and walks are usually poured 4" thick; a slab that carries a car or a hot tub, 5" to 6". The IRC sets 3-1/2" as the least for a concrete floor slab inside a house (R506.1); it does not cover patios outside, but your building department may set a minimum for a driveway.
Do I need gravel under a concrete slab?
For floor slabs, the IRC asks for a 4" base of gravel or crushed stone, except on well-drained sand or gravel soil (R506.2.2). Outdoors a compacted base drains water from under the slab and evens out soft spots, so 4" is the usual start; clay soil and cold winters call for more. Loose stone packs down when it is compacted, so the calculator buys 20% more than the compacted volume.
Does a concrete patio need rebar or wire mesh?
Not by code. Concrete cracks as it shrinks whatever you put in it; the control joints decide where. Rebar or welded wire mesh holds the edges of a crack tight and level so it stays a hairline. If you use steel, it has to sit at mid-depth on chairs — mesh trodden to the bottom of the pour does nothing. A common patio grid is #3 rebar 18" apart each way.
How far apart should control joints be?
The Portland Cement Association spaces them 24 to 30 times the slab's thickness: 8' to 10' apart for a 4" slab. Cut them a quarter of the thickness deep, and keep each panel close to square — no more than 1.5 times as long as it is wide. A 16' × 12' patio 4" thick comes out as 4 panels of 8' × 6'.